Kerala Forest Research Institute invited sealed quotation from reputed vendors/ firms to fabricate runoff monitoring structures (H flume) and staff gauge-3 Nos.
Specification for Staff for Monitoring Pond Water Level and H-Flume
1. Staff for Monitoring Pond Water Level (3 Nos.)
Base Block: Made of concrete for self-support (Size: 60 cm X 60 cm x 45cm)
Staff Height: 160-200 cm from the bottom of base support
Staff Material: GI rectangular pipe of size 4” x 2”
Markings on staff: Painting is to be done with synthetic enamel paint of two coats over a priming coat and Scale markings in cm to be painted on the staff gauge and on base support for water level measurement
Note: For details, design drawing is attached herewith
2. H-Flume
3 FEET H FLUME - 1 No.
2.5 FEET H FLUME - 2 Nos.
H-Flume Material: Frame work with MS angle 32 mm x 6 mm and base sides are covered with GI sheet of 16g, including painting with synthetic enamel paint of two coats over a priming coat.
Painted: With synthetic enamel paint of two coat over a priming coat.
Sl. No. | Flume type | A (cm) | POM (cm) | B (cm) | C (cm) | E (cm) | D (cm) |
1 | 3 FEET H FLUME | 173.74 | 27.43 | 32.97 | 9.14 | 123.44 | 91.44 |
2 | 2.5 FEET H FLUME | 144.78 | 22.86 | 27.47 | 7.62 | 102.87 | 76.2 |
Note: For details, design drawing is attached herewith
Terms and
conditions
REGISTRAR
Date of notification: December 11, 2024 | December 24, 2024 |
Download |