Kerala
Forest Research Institute invited sealed quotation from reputed vendors/ firms
to fabricate runoff monitoring structures (H flume) and staff gauge-3
Nos.
Specification for Staff for Monitoring Pond Water Level and H-Flume
1. Staff for Monitoring Pond
Water Level (3 Nos.)
Base Block: Made of concrete for self-support (Size: 60 cm X 60 cm x 45cm)
Staff Height: 160-200 cm from the bottom of base support
Staff Material: GI rectangular pipe of size 4” x 2”
Markings on staff: Painting is to be done with synthetic enamel paint of two coats over a priming coat and Scale markings in cm to be painted on the staff gauge and on base support for water level measurement
Note: For details, design drawing
is attached herewith
2. H-Flume
3 FEET H FLUME - 1 No.
2.5 FEET H FLUME - 2 Nos.
H-Flume Material: Frame work
with MS angle 32 mm x 6 mm and base sides are covered with GI sheet of 16g,
including painting with synthetic enamel paint of two coats over a priming
coat.
Painted: With synthetic enamel paint of
two coat over a priming coat.
Sl. No. |
Flume type |
A (cm) |
POM (cm) |
B (cm) |
C (cm) |
E (cm) |
D (cm) |
1 |
3 FEET H FLUME |
173.74 |
27.43 |
32.97 |
9.14 |
123.44 |
91.44 |
2 |
2.5 FEET H FLUME |
144.78 |
22.86 |
27.47 |
7.62 |
102.87 |
76.2 |
Note: For
details, design drawing is attached herewith
Terms and conditions
REGISTRAR
Date of notification: October 23, 2024 | November 7, 2024 |
Download |